Tour de Japan
TOUR DATES: 25TH MAY - 31ST MAY 2026 (10 Spots)
TRAIL TYPE: Hub and Spoke - Mountainous
TOTAL DISTANCE: XXkm (approx)
TOTAL ASCENT: approx XXM ascent
HIGHLIGHTS: We will be exploring The Central Alps, also known as the Kiso Mountains, are a mountain range in southern Nagano Prefecture, Japan. They are part of the broader Japanese Alps, along with the Northern and Southern Alps. The range stretches roughly 65 kilometers and is characterized by its steep, rocky terrain and diverse hiking opportunities.
HIGHEST POINT: XX **please note that the route is subject to change depending on local government restrictions.
DIFFICULTY: 15-25km days (run when you can, hike fast when you can’t)
TRIP DURATION TOTAL: 7days/6nights
ON TRAIL TOTAL: 5 days
ACCOMMODATION ON TRAIL: Ryokan: 6nights of the tour you will be staying in Nunoya Ryokan in the beautiful town of Matsumoto. Rooms will be twin share and include a private en-suite. Single occupancy tariff is not available on this tour due to the limited accommodation.
FOOD: Breakfast and lunch are included in the tour price. Dinner, alcohol and extra drinks are to be paid by guest.
COSTS
AU$xx twin share in hotel accommodation *$1000 deposit taken at time of booking
INCLUSIONS:
4* Hotel Accommodation
Private Bus Transfers to trail head
Train Fares for the duration of the tour.
National Park entry fees
2 x Guides + Driver
Emergency management (sat phone, first aid kit etc carried by guides)
Breakfasts and Lunch x 7
EXCLUSIONS:
Flights / transfers to Japan
Dinner
Alcohol
Extra drinks
Insurance
Souvenirs & extra activities
RUNNER HANDBOOK DOWNLOAD
Available for download HERE once finalised
ITINERARY
*PLEASE NOTE THAT THIS ITINERARY IS INDICATIVE ONLY AND MAY CHANGE TO SUIT CONDITIONS, NEW INFORMATION OR REGULATIONS. THE FINAL RUNNING ROUTE WILL BE CONFIRMED CLOSER TO DEPARTURE (and indeed daily according to conditions).
ARRIVAL DAY / 27 April
Your tour guides will meet you in Canggu for morning coffee intro’s. Bus transfer to the northern coast of Bali and to our accommodation at Lovina.
RUN DAY 01 / 28 April
Lovina Coastline - Aling Aling Waterfall - Lake View Tamblingan
26km 1623m+
RUN DAY 02 / 29 April
Lake View Tamblingan - Genung Lesung (volcano)* - Umejero
16km 850m+ -
RUN DAY 03 / 30 April
Umejero – Mt Batukaru* - Jatiluwih Rice Fields
17km 1650m+
RUN DAY 04 / 1 June
Jatiluwih – Riang Gede
22km 550m+
RUN DAY 05 / 2 June
Riang Gede – Tanah Lot
24km 250m+
TRAVEL DAY / 03 June
Tabanan to Denpasar Airport
Departing accommodation 9:30am - Arriving DPS Airport 11:30am
*You will arrive in at the airport approx. 1130am in time for AFTERNOON/evening flights. We can drop directly to airport.
TOTAL KM: 100km - TOTAL VERT: approx. 4300M Ascent